Drilling is started 11″ on the loose top soil formation and a 9″ temporary casing installed, then drilling 8″ up to recommended depth
Drilling is done after hydro-geological survey. Solfin Engineering has a variety of drilling machinery for both boreholes and water wells. In addition we have the expertise in handling drilling equipment and we ensure water is struck before we leave the site.
Actual drilling Process
Drilling is started 11″ on the loose top soil formation and a 9″ temporary casing installed, then drilling 8″ up to recommended depth